HOME REMODELING IN Burlingame

Burlingame filled in a few houses at a time between the 1890s and the 1960s, so a single block can hold a brown shingle cottage, a Tudor revival and a postwar ranch. Each of them hides something different behind its walls. DevArt8 Builders plans kitchens, bathrooms, additions and ADUs around the house you actually own, pulls the permit in our name (CSLB #1101484) and gives you one fixed price in writing before work starts.

What we remodel in Burlingame

The city is nearly built out, so most work here improves or adds to an existing house rather than starting from an empty lot (Neighborhood Design Guidebook). In a bungalow, Craftsman or shingle house from before the 1930s, we open up the plan only after checking the wiring, the pipes and the framing. In a ranch house or an Eichler from the 1940s to the 1960s, the slab floor and the low roof decide where new plumbing and any second story can go. We take on kitchens, bathrooms, whole-house remodels, additions and ADUs.

Who issues a Burlingame remodel permit

The Building Division of the Community Development Department plan checks the drawings, issues the permit and inspects the work. Every application is filed online through the city’s eTRAKiT portal. A kitchen or bathroom remodel that adds no living space is filed as a Residential Alteration; an addition, a deck or a balcony is a Residential Addition, and the city asks for at least 15 business days of review for either (submittal instructions).

Mills Estates, Ray Park, the Easton Addition

Burlingame has no official neighborhood map; its neighborhoods are known by their streets and the houses on them. The first subdivision was recorded in 1896 south of Burlingame Avenue, the Easton Addition joined in 1910 and doubled the city, and 35 more subdivisions followed up to 1963, filling the land toward Millbrae, Hillsborough and San Mateo. So the year the house was built tells us far more about the job than the zip code does.

4-full

What needs a permit in a Burlingame kitchen or bath

The city’s list is more precise than most. Painting, papering, tiling, carpet, new cabinets and countertops count as finish work and need no permit. Cutting into a wall, cutting a beam, or moving a supply line, a drain, a gas line or a circuit does, and replacing a leaking pipe counts as new work with its own inspection (exempt work list).

In the bathroom, a new tub or shower enclosure needs a permit; a toilet swapped in the same spot does not, if the new one uses no more than 1.28 gallons per flush (bathroom handout). In the kitchen, a new hood that vents outside needs a mechanical permit, and a remodel with structural work is filed under the Remodel subtype (kitchen handout). A house under a homeowners association also needs the HOA’s signed authorization letter.

Adding on: Design Review, parking and the hills

  • Design Review. All new houses, most second-story additions and some single-story ones go to the Planning Commission, checked against the R-1 standards for setbacks, lot coverage, height and floor area ratio, with a landscape plan (Residential planning). The city’s 2026-2027 Planning Fee Schedule lists Major Design Review for a single-unit home, new or addition, at $3,220 (fee schedule).
  • A new bedroom can change the garage. A house with up to four bedrooms needs one covered and one uncovered parking space; at five bedrooms it needs two covered spaces and one uncovered.
  • The Hillside Overlay. Any addition there, even a raised roof, needs a Hillside Area Construction Permit. Owners within 100 feet receive the plans and get 10 days to review them, and the 2026-2027 fee is $1,257 (review procedures).
  • Flood and fire. FEMA maps the Laguna Area, the Easton Creek Area and the major creeks as Special Flood Hazard Areas (flood maps), and new work in a designated fire hazard zone follows Wildland-Urban Interface codes (Central County Fire).
  • Historic status. A house over 50 years old can be evaluated for the local register the city created in 2020, and planning staff can tell you a property’s status before design starts (Historic Preservation).

How we run it, and our nearest work

We start with a visit to the house, then send one fixed written price that lists what it excludes, and a project manager carries the job to the final inspection. We have no filmed project in Burlingame yet. Up the Peninsula, we remodeled a house in San Francisco, bathroom and garage included (see the project); down it, Sachin’s garage remodel in Redwood City is finished and filmed (see his garage). Burlingame allows one ADU plus one JADU on a single-family lot, with a detached ADU held to 16 feet (ADU Development Guide); we build one in about 4 to 6 months from a signed contract.

Best Home addition services in Bay Area

Start with the house you have

Call +1 669-322-3368 or send the form below. Tell us roughly when your Burlingame house was built and what you want to change, and we will tell you at the visit whether it is finish work, a Residential Alteration or a Design Review project, and then put the price in writing.

Request a Free Estimate

    Burlingame ADU Checklist: Zoning, Size and Permit Rules

    Burlingame ADU Burlingame ADU Checklist Burlingame ADU Floor Plans Burlingame ADU Zoning And Building Standards Navigating the zoning and building standards for Accessory Dwelling Units (ADUs) in Burlingame can be complex. This comprehensive guide provides the essential information you need to understand the requirements and create your dream ADU in compliance with local regulations. Our team of experienced professionals is

    Read More »

    Burlingame ADU Floor Plan: Optimizing Space for Your Needs

    Burlingame ADU Burlingame ADU Checklist Burlingame ADU Floor Plans Unit Size When considering an ADU for your Burlingame property, it’s essential to choose the right unit size to accommodate your specific requirements. Our team at DevArt8 Builders offers a diverse selection of floor plans, ranging from compact studio units to expansive multi-bedroom layouts. We understand that every property owner has

    Read More »

    Burlingame ADU: Your Guide to a Seamless Build

    Burlingame ADU Burlingame ADU Checklist Burlingame ADU Floor Plans Efficient, Hassle-Free ADU in Burlingame Burlingame has embraced the concept of Accessory Dwelling Units (ADUs) as a solution to the growing housing crisis and to provide homeowners with increased flexibility and financial benefits. The city has implemented a comprehensive set of zoning and building standards to ensure that ADUs are constructed

    Read More »