HOME REMODELING IN Campbell

More of Campbell’s housing was built between 1960 and 1979 than in any other period, and the city’s own Housing Element notes that a home past 30 years usually starts to need reinvestment. That is most of the houses here. DevArt8 Builders remodels kitchens, bathrooms and whole houses in Campbell, builds additions and ADUs, and carries each one through the Building Division with the permit in our name (CSLB #1101484).

What a Campbell remodel usually means

In a house from the 1960s or 1970s we check the kitchen walls, the bathroom plumbing, the electrical panel and the garage before suggesting anything, and we plan around what is there: the slab or the crawl space, the bearing walls, and the soil, because Campbell’s General Plan calls for foundations on expansive soils to be engineered to current Title 24 standards (Safety Element). For an ADU on your lot, start with our Campbell ADU guide.

How Campbell reviews a remodel

The Building Division, part of Community Development, approves the plans and issues every construction permit. Applications go in online through MyGovernmentOnline, and Building, Planning, Land Development Engineering and the Santa Clara County Fire District all review the same set at once. The city asks you to allow 4 to 6 weeks for the first plan check and 2 to 4 weeks for each later round, and an application that has not become a permit within 180 days expires without a refund (remodel application guide).

San Tomas, Campbell Village and the Alice Avenue district

The San Tomas Area in the southwest is about 1.5 square miles of large, often irregular lots, many on streets without standard curbs or sidewalks, and its houses traditionally have simple rectangular forms under gabled or hipped roofs (San Tomas Area Neighborhood Plan). Campbell Village, about 485 parcels that joined the city in 2013, was built in phases from the 1940s to the 1980s, and its plan asks that an addition look like part of the original house. One Campbell renovation of ours is still under way, and its owner, Christine, is filming it.

A Campbell home renovation, in the owner’s words

Christine is documenting her renovation with us as it happens. The episode below is filmed part way through, with the kitchen in and the stucco still waiting on its last coat, so nothing here is a finished project talking.

A lot of the concerns coming into the project was, am I going to have to be super hands on? Do I have to manage down to the dust?

Christine, Campbell, on what she expected

Whenever there is a problem, Ray brings it up right away. There is no sugar coating. Instead of just being like, there is a delay, there is nothing we can do about it, it is like, we need to talk right now, there is a red flag here, we need to figure something out.

Christine, Campbell, on how bad news arrives

He is really quick to say, here is option one, here is option two, this is how we can fit into the timeline that you want.

Christine, Campbell, on what comes with the bad news

I do not feel like things are falling through the cracks and I do not feel like I need to come every day and really take a magnifying glass and look at stuff.

Christine, Campbell, on what changed

I was changing my mind a lot. But as things were popping up, very accommodating of that. They did not criticize me.

Christine, Campbell, on changing her mind

Knocked down the fireplace, new cabinets, countertops, a waterfall island, a range hood and all new flooring, with landscaping and the exterior still to come. This project is under way, not finished, and the next episode will show the rest.

4-full

What the drawings need, and what they do not

For a kitchen or bathroom remodel, the floor plan only has to show the rooms being changed, and a licensed engineer’s structural calculations are needed only when the plan makes significant structural changes (remodel guide). Trade permits often go without plans, but not for a new electrical panel, new plumbing fixtures, a whole-house rewire or a new water heater (trade permit guide). Every remodel sheet also states Seismic Zone D2, a minimum soil bearing of 1,500 psf and a heavy termite level, and the city’s work hours: 8 to 5 on weekdays, 9 to 4 on Saturday, never on Sundays or holidays.

Where Planning still comes in

Additions and alterations to a house in the R-1 district now go straight to the Building Division without a prior Planning approval. Planning applications are kept for historic properties, variances and additions outside R-1 (single-family applications). Campbell’s Historic Resource Inventory lists 147 properties; exterior work on a Landmark or a house in the Alice Avenue Historic District goes to the Historic Preservation Board, while interior work follows the same rules as any other house (historic FAQ).

  • Half the house or more. If an addition and remodel together exceed 50 percent of the existing floor area, garage included, the city wants a New House Determination request before you apply (new house guide).
  • Protected trees. Oak, redwood, cedar and ash trees 12 inches or more across are protected on single-family lots, and removing one needs a Tree Removal Permit. We site an addition with that in mind.
  • The garage. Turning a garage into living space may need a Planning approval or replacement parking. Turned into an ADU or JADU under the city’s March 5, 2025 bulletin, the removed parking does not have to be replaced, but the garage door must come out and the opening be finished to match the house (ADU bulletin).
  • School fees. School districts collect developer fees on residential work over 500 square feet, ADUs and garage conversions included, before the permit is issued.
  • Construction waste. Additions, alterations and demolitions need a CALGreen waste management plan filed through Green Halo.

Every job starts with a visit to the house and a written fixed price that names what it leaves out, and one project manager runs it to the final inspection. For finished projects near Campbell, see Arjun’s kitchen in San Jose and Keerthi and Monica’s addition in Santa Clara.

Best Home addition services in Bay Area

Have a Campbell house that is due?

Call +1 669-322-3368 or fill in the form below with your neighborhood and what you want to change. We will look at the house, tell you which reviews it needs, and send one written price before any work is scheduled.

Request a Free Estimate

    Campbell ADU Checklist: Key Requirements And Regulations

    Campbell ADU Campbell ADU Checklist Campbell ADU Floor Plans Campbell ADU Zoning And Building Standards Navigating the complex world of Accessory Dwelling Units (ADUs) in Campbell, California can be overwhelming. This comprehensive guide breaks down the zoning and building standards for ADUs in Campbell, empowering homeowners to make informed decisions and create the perfect additional living space on their property.

    Read More »

    Campbell ADU Floor Plan: Design Functional Spaces

    Campbell ADU Campbell ADU Checklist Campbell ADU Floor Plans Unit Size DevArt8 Builders offers a diverse selection of ADU floor plans to accommodate various space requirements and living arrangements. Our unit sizes range from compact studio apartments starting at 250 square feet to expansive two-story designs with up to 1,450 square feet of living space. Whether you’re looking to create

    Read More »

    Campbell ADU: Enhance Your Property

    Campbell ADU Campbell ADU Checklist Campbell ADU Floor Plans Efficient, Hassle-Free ADU in Campbell Campbell provides various ADU options, including standalone units, attached additions, and converted existing spaces. Each type of ADU has specific requirements and considerations. At DevArt8 Builders, we are experts at navigating these complexities to deliver functional and aesthetically pleasing ADUs. We will assist you throughout the

    Read More »