Bathroom Remodeling in Hillsborough

Most Hillsborough homes were built before 1980, and their bathrooms often need more power than the original wiring gives. We plan the electrical, the permits and the inspections first, then the finishes.

Remodeling a bathroom in an older Hillsborough home

Hillsborough is single-family only, about 3,860 homes spread over 6.2 square miles of hills and canyons (Town page), on lots that have had a half-acre minimum since 1953 (Town history). The Town’s Housing Element adds two numbers that matter more for a bathroom: about 80 percent of its homes were built in 1979 or earlier, and where nothing has been replaced, electrical capacity is one of the features that usually needs updating (Housing Element).

Power first, then tile

A primary bathroom today often wants heated floors, a steam unit, lit mirrors and a fan on a humidity sensor. In a house wired decades ago, those loads have to come from somewhere. Before any design talk we read the panel label and count spare breaker slots; whether the bathroom fits on today’s service, or needs an upgrade, then shows up as a line in your quote instead of a surprise mid-demolition.

How the Town permits the work

Renovations of bathrooms need a building permit in Hillsborough, and electrical, plumbing and heating work normally carry their own separate permits (Building Permits, Obtaining a Permit). Applications are electronic only, on eTRAKiT, and a contractor must be registered with the Town before it can even log in (General Permit Information). The fee follows the size and value of the job. Once issued, the stamped plans stay on site for the whole job.

Two practical rules shape the calendar. An inspector needs three days of warning, with no exceptions for tomorrow or today, and crews may only work weekdays between eight and five (Building Division). We book inspections ahead of each stage so the crew is not idle waiting for one.

Design approval

Under its 2004 design guidelines, Hillsborough expects design approval for the majority of changes to a house, on top of the permit (guidelines). Additions under 500 square feet are reviewed by staff; bigger ones, plus any street-visible second story, go before the Town’s design board (ADRB) (Planning Applications). A bathroom inside the existing walls usually stays clear of that, but a new window or bump-out does not. Hillsborough has no historic register (1990 survey page), so age alone does not bring historic review.

Closest proof

We have yet to complete a bathroom inside Hillsborough. North of you, we rebuilt both original bathrooms in a 1952 San Francisco house; south, Butian filmed his Atherton bathroom remodel with us, and we remodeled a Redwood City garage. CSLB license #1101484.

Local Expertise

Electrical capacity checked before design

Custom Designs

Inspections booked three days ahead, as the Town requires

Licensed Professionals

CSLB #1101484, registered on the Town portal

Transparent Pricing

Fixed price on paper before work starts

What we remodel in Hillsborough

Primary suites

Full rebuilds with new circuits, plumbing and ventilation behind the finishes.

Showers, steam and tubs

Large walk-in showers, steam units and soaking tubs, sized to the power available.

Vanities and dressing areas

Double vanities, built-in storage and makeup counters.

Stone and heated floors

Natural stone or large porcelain set on a membrane, warmed from below.

Lighting and controls

Layered lighting and quiet fans on their own circuits.

Accessible design

No-step showers, benches and grab bar backing.

A rebuild from bare walls to finish

During, San Francisco
December 2025: shower walls waterproofed and a niche set, before the tile. See the project
Finished, San Francisco
A walk-in shower with patterned black and white tile. See the project
During, San Francisco
January 2026: accent tile up around the new tub, the vanity set. See the project
Finished, San Francisco
The second bathroom: vertical tile with color accents around the tub. See the project

What our customers say about the work

Hillsborough remodel FAQ

Does the Town review the design of a bathroom?

The Town says most design changes to a home need design approval as well as a permit (Residential Design Guidelines). Remodeling within the current walls normally stays a Building Division matter; a new window, skylight or bump-out brings Planning in. We confirm with the Town which applies before drawing.

Three days. The Building Division asks for a three-day lead time on inspection requests and cannot do same-day or next-day inspections (Building Division). We book each one before the stage it checks is finished.

Often. Four in five houses here date from 1979 or before, and Hillsborough’s own housing study lists electrical capacity among the things that usually need bringing up to date if they were never replaced (Housing Element). Heated floors and steam add load, so the panel is the first thing we look at.

It scales with how big the job is and what it is worth, and it pays for intake, plan review and inspections (Obtaining a Permit). Separate electrical, plumbing and heating permits add their own. We itemize them in your price.