Emerald Hills is not a city. Officially it is Emerald Lake Hills, part of unincorporated San Mateo County, and an addition here is permitted by the county’s Planning and Building office in its online system, not by Redwood City down the hill. It grew from two subdivisions laid out around 1920 as a getaway for people from the city, and newer homes have mostly replaced the old cabins on the same sites. That history is why lots are steep and no two houses look alike.
Since July 23, 2026, design review here has been a staff-level step tied to the building permit, which makes an addition simpler to approve than it was. The hillside rules have not changed, and they are what we design around.
Another bedroom, a study or a kids' room, built alongside. On a grade of 15 percent or steeper, local design standards require new construction to step with the hillside, so the room may sit a few steps above or below the existing floor.
On a steep lot, going up can be easier than going out, within limits: in the RH district the highest point of the roof stays at or below 28 feet, and the part of a house that projects into the front setback must stay single story. An addition that goes above two stories or 24 vertical feet needs a geotechnical report.
A few feet of extra kitchen or dining room is often the best use of a tight hillside footprint. Lot coverage in the RH district is limited to 25 percent of the site, raised decks and patios included, so we measure what is already covered before we add to it.
A larger living room that opens to a view. The local design standards rule out cantilevering a room over the hillside on posts more than 10 feet tall, so on a steep drop the floor is carried on stepped foundations or retaining walls instead.
A bedroom, bathroom and closet added together. The county requires a permit before any plumbing, electrical, gas or mechanical system is installed, altered or replaced, so the new bathroom's drain, vent and fan are all drawn and inspected.
When the family wants separate space with its own kitchen, the county's ADU rules apply instead, and that ordinance lists this community among its wildfire interface areas. See our Emerald Hills ADU page for that path.
The whole community is inside a design review district, so any exterior addition is looked at. What changed in 2026 is how: the new design review ordinance, adopted by the supervisors in June and in force since July 23, made it a ministerial check. It is done by staff inside the building permit review, needs no separate filing, and is complete before issuance. The test is compatibility: roof shape, colors or materials of the new part must fit the house it joins.
The Residential Hillside zoning draws the box. Floor area: 30% of the lot or 2,400 sq ft, whichever is larger. Coverage: no more than one-quarter of the site, counting raised decks and patios with the buildings. Setbacks: 20 ft at the front and 20 ft at the back. Height: 28 ft. And any tree more than 19 inches around the trunk is treated as a significant tree.
The county’s geotechnical guidance requires one for a residential addition over 500 square feet in a mapped geologic hazard zone (waivers are accepted), for any addition over two stories or 24 vertical feet, and on any lot with a slope of more than 2:1 or an “L” designation on the landslide map. Grading on an RH site is limited to 1,000 cubic yards, and clearing vegetation on slopes over 20 percent needs a land clearing permit.
Nineteen inches of circumference is a modest trunk, so on a wooded Emerald Hills lot many trees count as significant under the hillside rules. We map every trunk before placing the footprint, keep new footings clear of the main roots where the plan allows, and if a tree truly has to go, we learn what the county asks for before anyone touches it.
The county treats Emerald Lake Hills as wildland interface in its ADU rules. The state’s WUI building code, Chapter 7A, applies to new buildings in High and Very High Fire Hazard Severity Zones; we confirm your parcel’s zone on the county map before choosing roofing, vents and siding.
Next door in Redwood City we remodeled Sachin’s garage, and over in Woodside a backyard ADU of ours is close to done. The additions we have finished are in Santa Clara and Union City.
Slope decides the shape: above 15 percent the building steps with the grade, stilts over 10 feet are not allowed, and a steep or landslide-mapped parcel needs a geotechnical report.
San Mateo County issues it. Completeness is usually confirmed within about five days, and plan reviewers generally approve or send comments within 30.
Many houses here were rebuilt on old cabin sites, so the existing foundation is opened and checked by an engineer before a new room or floor is tied into it.
The design review standard is compatibility: roof forms, colors or materials that match the house, in a community the county itself describes as a mix of many styles.
County fees, a soils report where required, and the build. We see the lot, then put one price in writing, exclusions named, with the timeline attached.
We file through the county’s online Permit Center; the permit is issued to us, CSLB #1101484. Planning’s own charges, in the fee table in force since July 23, 2026: $646 for the ministerial design review of a house addition and $887 for reviewing the building plans, one resubmittal included. Building permit fees come on top.
From the County Planning and Building Department; ministerial design review is completed before it is issued.
Capped at 1,000 cubic yards on an RH site, with a land clearing permit where slopes pass 20 percent.
Swapping an existing receptacle is exempt in the county; adding outlets and circuits for new rooms is not.
Any new or replaced pipe, valve or fixture; only clearing stoppages and fixing leaks without replacing parts is exempt.
Installing or altering heating, ventilation or gas equipment for the addition.
Residential Hillside limits on height, floor area, coverage and setbacks, checked by staff with the permit.
Significant tree protection, geotechnical reports on steep or mapped lots, and WUI construction where the fire zone calls for it.
County inspectors check the work as it goes, from the foundation forms to the final. Each county visit is booked by us and attended by us, and the job is signed off at the final.
With the lot. We look at the slope, the setbacks, the existing floor area and coverage, the trees and the landslide map, then tell you what size and shape of addition the RH rules leave room for. Design starts after that.
Plan on roughly five days until the application is accepted as complete and up to about 30 for plan reviewers' comments, with design review now folded into that same review rather than ahead of it. A soils report adds time up front. Construction time hangs on the foundation the slope requires; the timeline comes on paper together with the price.
Yes, but it is simpler since July 23, 2026. It is now a staff check of your building permit application against the design standards: one application, no hearing.
Yes, with the engineering the county asks for. That means stepping the building with the grade above 15 percent slope, no stilts over 10 feet, a geotechnical report where the parcel is steep or landslide mapped, and grading kept under 1,000 cubic yards.
The footings the slope and soil require, the floor area, whether it is one level or two, how trucks and concrete reach the site, fire-rated materials where required, and what the new rooms contain. No phone quotes: after a site visit, you receive one fixed number in writing.
Often a little. More rooms mean more electrical load and sometimes need a larger panel; a bathroom needs a drain route that works downhill; heating has to reach the new space. We check all three on the first visit so they are in the plan.