Home Additions in Redwood City

Two permits for a second story, one for a ground floor

Redwood City treats the two kinds of addition very differently. A room added at ground level is a building permit and plan review. Anything that adds an upper floor, however small, needs a Planning approval before anything else: an Architectural Permit, which the city’s Zoning Administrator issues only when the required findings can be made. Knowing which one you are planning changes the schedule by months, so it gets settled at our first meeting.

Ground-level room additions

A bedroom, a study or a guest room built off the back or side. No Planning approval is needed for it, and the city's estimate for reviewing an addition is three to four weeks. The roof, siding and floor height are matched to the house.

Building a second floor

Upstairs, the city's design guide is the rulebook: how the bulk is massed, how far the upper walls step back, what the roof does and where windows look. Put over a hundred square feet up there and the houses around you are notified; take the house past 3,000 sq ft or an FAR of 0.45 and a public hearing follows.

Larger kitchens and dining rooms

Pushing the kitchen into new floor area usually moves plumbing, adds counter circuits and opens a wall. Redwood City permits all added building, electrical, plumbing and mechanical work in a kitchen, so the whole change is drawn and inspected.

In-law space, ADUs and garages

For a relative who needs their own kitchen, an ADU follows the city's ADU ordinance, which can call for special foundation design on hillside or bay mud lots. Our Redwood City garage remodel kept the garage a garage, with new flooring and cabinets; converting one is a different permit.

Family room extensions

A bigger living space at the back of the house, often with doors to the yard. If the lot sits in a mapped flood area, Chapter 41 of the city code can set how high that floor must be, so the map comes before the sketch.

Primary bedroom suites

A bedroom with its own bathroom and closet. The bathroom is the costly part: a new drain line, a vented fan and new circuits. Combine a large addition with a remodel and the city's 50 percent sprinkler policy may call for fire sprinklers; we find that out before pricing.

Redwood City’s Building Division, part of Community Development, checks additions against the 2025 state codes and the city’s own amendments, in force since January 1, 2026. Submittals are filed electronically on eTRAKiT. The city’s review estimates put an addition, a residential alteration and a structural check each at three to four weeks.

The Architectural Permit

The Planning Division’s handout applies it to two-story houses, new or created by adding a floor. The Zoning Administrator weighs it, and once a house would exceed 3,000 sq ft or an FAR of 0.45 it is heard in public, as a hillside house may be. Planning’s fees since July 1, 2026: $2,595 for a residential Architectural Permit, $4,695 for the hillside version that includes a Zoning Administrator hearing.

Older houses

Houses from before the 1940s, and those inside a historic district, get a Historic Resources Report written by a qualified historian, which the owner funds through a $5,000 deposit. If the historian concludes the house is a historic resource, the house cannot be torn down and the city may restrict how it grows. If your house is past 50, the city suggests an early talk with a planner, and we book it before any design work.

Flood maps and the shoreline

The flood maps in force date from 2019, and they moved about 950 lots outside Redwood Shores into FEMA’s mapped flood hazard area, lots the 2012 edition had left out. Building on one of those lots, or rebuilding much of a house there, brings in the city’s floodplain chapter, written to national flood insurance standards. Along the lagoons of Redwood Shores, work that could affect the banks falls under a policy of its own.

Fifty years and older

Once a house passes 50 years, Redwood City asks its owner to check with a planner before remodeling it. On those houses we also expect the usual surprises of the era behind the walls, so the drawings leave room for what opening the old wall reveals and the price says how such finds are handled.

Our job in Redwood City

Sachin’s garage here was one of our jobs, with his family living in the house. Sachin had delayed any remodel for years because an earlier company kept not showing up, and what his wife noticed about our crew was that they protected the house without being reminded. Our closest finished additions are in Santa Clara and Union City. See also remodeling in Redwood City.

Key Consideration for a Redwood City addition

  • Which review it triggers

    Is it one level, or does it add a floor? A new floor means the Architectural Permit, notice to neighbors past 100 sq ft upstairs, and a hearing past 3,000 sq ft or 0.45 FAR.

  • What the old house can carry

    An engineer reads the footings, framing and roof before an upper floor or a wide opening is drawn, and the city's structural check runs inside the same plan review.

  • Windows the neighbors will see

    The Residential Design Guide addresses upstairs window placement, so daylight for you and privacy for the house next door are designed together.

  • Sprinklers and the 50% rule

    A large addition paired with a remodel can cross the city's 50% Rule and require fire sprinklers; better known at the design stage than at plan check.

  • A price you can plan around

    Three things set the total: Planning fees, a historic report deposit if one is needed, and the construction. After seeing the house we commit to one price on paper, listing what is excluded.

Permits for an addition in Redwood City

Redwood City’s rule is short: unless the building code lists the work as exempt, it needs a permit, and the exempt list is mostly finishes such as paint, tile, cabinets and counters. We prepare and submit the permit set, take the comments, and the permit is issued under CSLB #1101484.

  • Building Permit

    Comes from the Building Division when plan check is done, a stage the city estimates at three to four weeks.

  • Grading Permit

    On a sloping lot, the cut and fill a new foundation needs is shown and reviewed with the plans.

  • Electrical Permit

    Required for every new circuit and outlet in the addition, and for receptacles that move when cabinets do.

  • Plumbing Permit

    Required for new fixtures, and for replacing a hidden drain, waste, vent or water pipe, which the city counts as new work.

  • Mechanical/HVAC Permit

    Required when ducts or heating and cooling equipment are added for the new rooms.

  • Zoning Permit

    The Architectural Permit that every upper-floor addition needs.

  • Environmental Permits

    Floodplain standards on mapped flood lots, and the lagoon bank rules for Redwood Shores homes on the water.

Weekday construction hours are 7 AM to 8 PM. Saturdays, Sundays and holidays need a written OK from the Building Official, requested a month ahead. At least 65% of the construction debris must be recycled, with the paperwork due within 90 days of the final inspection, and we file it.

Frequently Ask Question

Yes. The addition itself is permitted, and so are its wiring, plumbing and ducts. If it includes a second story, an Architectural Permit from Planning comes first.