Redwood City treats the two kinds of addition very differently. A room added at ground level is a building permit and plan review. Anything that adds an upper floor, however small, needs a Planning approval before anything else: an Architectural Permit, which the city’s Zoning Administrator issues only when the required findings can be made. Knowing which one you are planning changes the schedule by months, so it gets settled at our first meeting.
A bedroom, a study or a guest room built off the back or side. No Planning approval is needed for it, and the city's estimate for reviewing an addition is three to four weeks. The roof, siding and floor height are matched to the house.
Upstairs, the city's design guide is the rulebook: how the bulk is massed, how far the upper walls step back, what the roof does and where windows look. Put over a hundred square feet up there and the houses around you are notified; take the house past 3,000 sq ft or an FAR of 0.45 and a public hearing follows.
Pushing the kitchen into new floor area usually moves plumbing, adds counter circuits and opens a wall. Redwood City permits all added building, electrical, plumbing and mechanical work in a kitchen, so the whole change is drawn and inspected.
For a relative who needs their own kitchen, an ADU follows the city's ADU ordinance, which can call for special foundation design on hillside or bay mud lots. Our Redwood City garage remodel kept the garage a garage, with new flooring and cabinets; converting one is a different permit.
A bigger living space at the back of the house, often with doors to the yard. If the lot sits in a mapped flood area, Chapter 41 of the city code can set how high that floor must be, so the map comes before the sketch.
A bedroom with its own bathroom and closet. The bathroom is the costly part: a new drain line, a vented fan and new circuits. Combine a large addition with a remodel and the city's 50 percent sprinkler policy may call for fire sprinklers; we find that out before pricing.
Redwood City’s Building Division, part of Community Development, checks additions against the 2025 state codes and the city’s own amendments, in force since January 1, 2026. Submittals are filed electronically on eTRAKiT. The city’s review estimates put an addition, a residential alteration and a structural check each at three to four weeks.
The Planning Division’s handout applies it to two-story houses, new or created by adding a floor. The Zoning Administrator weighs it, and once a house would exceed 3,000 sq ft or an FAR of 0.45 it is heard in public, as a hillside house may be. Planning’s fees since July 1, 2026: $2,595 for a residential Architectural Permit, $4,695 for the hillside version that includes a Zoning Administrator hearing.
Houses from before the 1940s, and those inside a historic district, get a Historic Resources Report written by a qualified historian, which the owner funds through a $5,000 deposit. If the historian concludes the house is a historic resource, the house cannot be torn down and the city may restrict how it grows. If your house is past 50, the city suggests an early talk with a planner, and we book it before any design work.
The flood maps in force date from 2019, and they moved about 950 lots outside Redwood Shores into FEMA’s mapped flood hazard area, lots the 2012 edition had left out. Building on one of those lots, or rebuilding much of a house there, brings in the city’s floodplain chapter, written to national flood insurance standards. Along the lagoons of Redwood Shores, work that could affect the banks falls under a policy of its own.
Once a house passes 50 years, Redwood City asks its owner to check with a planner before remodeling it. On those houses we also expect the usual surprises of the era behind the walls, so the drawings leave room for what opening the old wall reveals and the price says how such finds are handled.
Sachin’s garage here was one of our jobs, with his family living in the house. Sachin had delayed any remodel for years because an earlier company kept not showing up, and what his wife noticed about our crew was that they protected the house without being reminded. Our closest finished additions are in Santa Clara and Union City. See also remodeling in Redwood City.
Is it one level, or does it add a floor? A new floor means the Architectural Permit, notice to neighbors past 100 sq ft upstairs, and a hearing past 3,000 sq ft or 0.45 FAR.
An engineer reads the footings, framing and roof before an upper floor or a wide opening is drawn, and the city's structural check runs inside the same plan review.
The Residential Design Guide addresses upstairs window placement, so daylight for you and privacy for the house next door are designed together.
A large addition paired with a remodel can cross the city's 50% Rule and require fire sprinklers; better known at the design stage than at plan check.
Three things set the total: Planning fees, a historic report deposit if one is needed, and the construction. After seeing the house we commit to one price on paper, listing what is excluded.
Redwood City’s rule is short: unless the building code lists the work as exempt, it needs a permit, and the exempt list is mostly finishes such as paint, tile, cabinets and counters. We prepare and submit the permit set, take the comments, and the permit is issued under CSLB #1101484.
Comes from the Building Division when plan check is done, a stage the city estimates at three to four weeks.
On a sloping lot, the cut and fill a new foundation needs is shown and reviewed with the plans.
Required for every new circuit and outlet in the addition, and for receptacles that move when cabinets do.
Required for new fixtures, and for replacing a hidden drain, waste, vent or water pipe, which the city counts as new work.
Required when ducts or heating and cooling equipment are added for the new rooms.
The Architectural Permit that every upper-floor addition needs.
Floodplain standards on mapped flood lots, and the lagoon bank rules for Redwood Shores homes on the water.
Weekday construction hours are 7 AM to 8 PM. Saturdays, Sundays and holidays need a written OK from the Building Official, requested a month ahead. At least 65% of the construction debris must be recycled, with the paperwork due within 90 days of the final inspection, and we file it.
Yes. The addition itself is permitted, and so are its wiring, plumbing and ducts. If it includes a second story, an Architectural Permit from Planning comes first.
Plan check for an addition is estimated by the city at three to four weeks, and structural review runs in the same window. Adding a floor puts the Planning approval ahead of that, and a hearing if the house grows past 3,000 sq ft or an FAR of 0.45. How long the building takes depends on what you build; the schedule comes in writing with our price.
Usually, with an extra step. For homes from before the 1940s the city orders a historian's report, funded by a $5,000 deposit. If the report says the house is historically significant, the addition may be limited in size or placement, and we design to what the report allows.
It should, and for a second story the city's Residential Design Guide asks for it through massing, roof design and step-backs. We match roof pitch, siding, trim and window style, and line up the new floor with the old one.
For most ground-floor additions, yes. We seal off the work area, protect floors and furniture and clean at the end of each day. Sachin's family stayed in their Redwood City home through our garage job, and the protection is what they mentioned.
The zoning district sets setbacks, height and lot coverage. On top of those, two published review lines matter: a public hearing for homes over 3,000 sq ft or past an FAR of 0.45, and neighbor notice once new upper floor passes a hundred square feet.
Before you fix a move-in date. Design, a possible historic report, the Architectural Permit for a second story and the 3 to 4 week plan check all come before construction starts. One visit to the house tells you which of those steps apply to yours.