San Lorenzo is, for the most part, a single subdivision. David Bohannon’s San Lorenzo Village, roughly 5,000 houses put up over the 1940s and 1950s, began as small houses, two or three bedrooms each, for families working in the East Bay war plants, and was planned from the start with its own schools, parks, churches and shopping. Few American suburbs were planned that completely, that early. Eighty years on, many of those houses are still the size they were drawn, and the families in them need another bedroom, a second bathroom or a room to work in.
Three things are different here from a city like Hayward next door:
San Lorenzo is unincorporated, so Alameda County issues the permit.
The county’s own residential design standards apply.
Most Village homes also carry the Homes Association’s covenants.
The most common reason to add on to a house that started with two or three bedrooms. Built at the back on its own footing, with a roof that runs on from the original, the new room keeps the front of the house as the street knows it.
On a compact Village lot, a second floor can add more than the yard allows. It is also the biggest change to the look of the street, so the county's design standards and the Homes Association's rules both weigh in, and an engineer checks whether a 1940s or 1950s foundation can carry it.
A bedroom and a bathroom together, sometimes with a family room. One permit, one set of drawings, one crew; the county's checklist for single-family remodels and additions lists what the set must show.
An office or a playroom at ground level is the smallest addition, but it still goes through Planning and Zoning before the building plans are reviewed, and through the county's inspections once it is built.
Kitchens in these houses were sized for the 1950s. Pushing one out into the yard means moving plumbing and adding circuits, all drawn into the same county permit as the new floor area.
Many Village houses still have only the bathrooms they were built with. Adding another, inside an addition or carved from an existing room, means new drain lines, venting and a ducted fan; for a remodel of the existing bathroom, see our San Lorenzo bathroom page.
Because San Lorenzo is not a city, the building permit comes from the Building Inspection Department of the Alameda County Public Works Agency, whose permit center serves all the unincorporated communities from Hayward. Everything is filed on the Alameda County Permit Portal: the application, the plans, the inspection requests and the status checks. The county does not accept these by other means.
Alameda County is one of the few agencies here that puts numbers on it. Adding to a house: five business days to accept the submittal, thirty for the first round of comments, fifteen for every round after. None of that starts until Planning and Zoning have signed off, and the county warns that bigger valuations take longer.
Since the start of 2015, house projects in the county’s unincorporated west side, including San Lorenzo and Castro Valley, have been judged against a single county design standards document for residential work, adopted late in 2014. Their stated aim is to keep and improve the character of the existing neighborhoods, which in the Village means additions that look as though they belong on a Bohannon street.
Beyond the county, most Village lots carry covenants dating from the original subdivision, and those covenants give the local Homes Association a say. We ask you for any association approval your covenants require before we submit to the county, so one review does not undo the other.
We have not built in San Lorenzo yet. Next door in Hayward, Angela’s backyard ADU is finished, and in San Leandro we completed one for Luis. Our nearest additions stand in Union City, one completed in late summer 2026 together with two rebuilt bathrooms, the other in 2025.
The age of the frame. Houses from the 1940s and 1950s were built to the rules of their day; before an addition is tied in, the existing foundation, framing and roof are opened and looked at.
Who approves what. County planners first, then county plan checkers, with the Homes Association's covenants alongside for most Village homes.
The room you are missing. In a house built with two or three bedrooms the answer is usually a bedroom, a bathroom or both, and that decides where the addition attaches.
The current code. Insulation, windows and wiring in the new rooms meet today's energy rules, which usually makes them the most comfortable rooms in the house.
The systems behind the walls. Original wiring and plumbing in an 80-year-old house often need upgrading to serve more rooms, and we look at both before pricing.
Two county forms go in with our drawings: the county’s checklist for adding to or remodeling a single-family house, and its alteration and addition worksheet. We apply as the licensed contractor, CSLB #1101484, so county inspectors call us, not you.
Issued by the county's Public Works Agency once zoning is cleared and the plans pass review.
Reviewed where the new footings or the drainage around them move soil.
For wiring the added rooms, and a panel upgrade where the original service is too small.
For a second bathroom or a relocated kitchen sink, tied into the house's existing lines.
For carrying heat into the new space, by duct or by heat pump.
Zoning review by the county's planners, against the residential design standards.
The facts we have do not show a special hazard review for San Lorenzo; we check the county's maps for your parcel.
County inspections are requested through the same portal. We are there for each one, from footings to final, and we call the job finished only when the county’s final is signed.
Yes, from Alameda County, not from a city. Planning and Zoning approve it first, then the Building Inspection Department reviews the plans and inspects the work.
After Planning and Zoning approve it, the county's own targets apply: five business days to log it in, thirty business days for first comments, fifteen per later round. Construction time depends on the size of the addition; we write the schedule into our price.
How many square feet, whether it goes up, whether it holds a bathroom or kitchen, and how much of the original house must be upgraded to serve it. County fees are separate. Once we have been inside the house, you get one fixed number on paper with its exclusions.
Sometimes. An engineer has to confirm that the original foundation and walls can carry it, the county's design standards have to accept how it changes the street, and most Village homes need the Homes Association's agreement too. A ground-floor addition is usually simpler.
If your house is in San Lorenzo Village, probably, since the original covenants cover most Village homes. Check your deed or ask the association, and we will build its review into the schedule.
The county's zoning for your parcel sets setbacks and height, and its residential design standards guide how the addition fits the neighborhood. We read both for your lot at the start, rather than quote general limits that may not fit it.