Project · Fremont, CA

Roger and Amy’s whole home remodel in Fremont, from May to October 2025

Roger and Amy had lived in their Fremont house for 20 years. The remodel replaced the kitchen, rebuilt the upstairs master bath around a larger shower, and put new floors and paint through the house, all photographed by our crew as it was built.

The finished Fremont kitchen: wood shaker cabinets, white veined counters and an island under two pendant lights
WhereFremont, CA
WhatKitchen, master bath, floors and paint
WhenMay to October 2025
StatusCompleted

Roger and Amy had lived in this Fremont house for 20 years and had talked about remodeling it for a few years before they started. The two big rooms were the kitchen and the upstairs master bath, with new floors and paint through the house and some of the family room windows and doors.

In the kitchen every cabinet, counter and sink was replaced, and a second sink was added. The new cabinets are wood shaker with glass-front uppers, under white counters and a full-height backsplash veined in brown, with an island under two pendants, stainless wall ovens and a black glass cooktop. The master bath was gutted and the shower enlarged: it now has large tile from floor to ceiling, a bench and a rain head behind glass, next to a long wood vanity with round mirrors and a freestanding tub under the window. The curved staircase got new treads, and the family room fireplace a dark veined slab with built-in shelves beside it.

Our crew photographed the work as it went. In early May the walls were closed and the new shower waterproofed, and later that month the kitchen cabinets arrived. June was cabinets, tile, the fireplace slab and new floors. In July the stair treads and the last of the kitchen counters went in, and by the end of the month the master bath was nearly done. The finished house was photographed in October.

In Roger and Amy’s words

Roger & Amy's Full Home Renovation Reveal in FremontRoger & Amy’s Full Home Renovation Reveal in Fremont

“We really felt that he’s very sincere. We liked him and we decided to go with him.”

Roger and Amy, choosing a builder

“So we discussed our concept and some particular parts with Ray and Ray gave us lots of input. What is easy, what is not, which looks good but it won’t be good in the end.”

Roger and Amy, planning the design

“We do run into little issues here and there but as soon as we let the manager know the issues will be resolved the right way.”

Roger and Amy, when issues came up

“We enjoy it very much and we like it very much. It’s exactly actually even better than we first thought.”

Roger and Amy, the finished house

The finished rooms

The kitchen from the refrigerator end, with glass-front upper cabinets, stainless wall ovens and the range hood beyond
The sink under the kitchen window, with a full-height veined backsplash and a large pendant overhead
The sink run: wood shaker cabinets, a stainless dishwasher and veined counters, with a sliding door to the yard
A black glass cooktop set into the white counter, with the veined backsplash and a light under the upper cabinet
The veined island top, with glass-front cabinets, a second sink and the wall ovens behind it
The master bath vanity with a round brass mirror and two sconces, beside a freestanding tub and the window
The enlarged walk-in shower behind glass, tiled from floor to ceiling, with a rain head and a second shower head
Inside the shower: a tiled bench, a handheld shower on a bar, a grab bar and a large rain head
The curved staircase with new wood treads, white risers and white balusters under a dark handrail

How it was built, month by month

May 2025

Walls closed and taped, the enlarged master shower coated in red waterproofing, then the new kitchen cabinets delivered late in the month.

May: the kitchen down to new drywall, with plumbing and electrical boxes ready and the floor covered
May: the enlarged master shower coated in red waterproofing, between newly drywalled walls
Late May: the new kitchen cabinets delivered in their boxes, under the kitchen window
June 2025

Cabinets, counters and tile: the glass-front cabinets and veined backsplash in the kitchen, large tile in the shower, and the dark slab around the family room fireplace over the new floors.

June: glass-front cabinets, a small sink and the veined backsplash installed, the floor still covered
June: large tile going up in the shower, with the bench built and a niche set in the wall
June: a dark veined slab around the family room fireplace, with wood shelves and cabinets built in beside it
July 2025

New treads on the stairs and the last kitchen counters early in the month; by late July the master bath was nearly done.

Early July: new wood treads and white risers on the stairs, the floor below still protected
Early July: the counters and backsplash in on the cooktop wall, the sink cabinet open for plumbing
Late July: the master bath nearly done, with a long wood vanity, round mirrors and a freestanding tub

Planning a whole home remodel in Fremont?

Talk to the team that built this one. CSLB licensed (#1101484) and insured, building in the Bay Area for over 15 years.

Call (669) 322-3368