Roger and Amy had lived in their Fremont house for 20 years. The remodel replaced the kitchen, rebuilt the upstairs master bath around a larger shower, and put new floors and paint through the house, all photographed by our crew as it was built.

Roger and Amy had lived in this Fremont house for 20 years and had talked about remodeling it for a few years before they started. The two big rooms were the kitchen and the upstairs master bath, with new floors and paint through the house and some of the family room windows and doors.
In the kitchen every cabinet, counter and sink was replaced, and a second sink was added. The new cabinets are wood shaker with glass-front uppers, under white counters and a full-height backsplash veined in brown, with an island under two pendants, stainless wall ovens and a black glass cooktop. The master bath was gutted and the shower enlarged: it now has large tile from floor to ceiling, a bench and a rain head behind glass, next to a long wood vanity with round mirrors and a freestanding tub under the window. The curved staircase got new treads, and the family room fireplace a dark veined slab with built-in shelves beside it.
Our crew photographed the work as it went. In early May the walls were closed and the new shower waterproofed, and later that month the kitchen cabinets arrived. June was cabinets, tile, the fireplace slab and new floors. In July the stair treads and the last of the kitchen counters went in, and by the end of the month the master bath was nearly done. The finished house was photographed in October.
Roger & Amy’s Full Home Renovation Reveal in Fremont
“We really felt that he’s very sincere. We liked him and we decided to go with him.”
Roger and Amy, choosing a builder
“So we discussed our concept and some particular parts with Ray and Ray gave us lots of input. What is easy, what is not, which looks good but it won’t be good in the end.”
Roger and Amy, planning the design
“We do run into little issues here and there but as soon as we let the manager know the issues will be resolved the right way.”
Roger and Amy, when issues came up
“We enjoy it very much and we like it very much. It’s exactly actually even better than we first thought.”
Roger and Amy, the finished house









Walls closed and taped, the enlarged master shower coated in red waterproofing, then the new kitchen cabinets delivered late in the month.



Cabinets, counters and tile: the glass-front cabinets and veined backsplash in the kitchen, large tile in the shower, and the dark slab around the family room fireplace over the new floors.



New treads on the stairs and the last kitchen counters early in the month; by late July the master bath was nearly done.



Talk to the team that built this one. CSLB licensed (#1101484) and insured, building in the Bay Area for over 15 years.