Project · Los Altos, CA

Gordon’s whole home remodel in Los Altos, 2025

Gordon’s house was 70 years old, and the remodel touched every part of it: both bathrooms, the kitchen, an addition to the master bedroom, new floors and carpet, new plumbing and electrical, and new stucco outside.

The back of the Los Altos house in new stucco, with sliding doors onto the patio and a ladder still at the brick chimney
WhereLos Altos, CA
WhatWhole home remodel and addition
When2025
StatusCompleted

Gordon’s house was 70 years old when he and his wife decided to remodel it, and the plan touched every part of it: both bathrooms, the kitchen, an addition to the master bedroom, new flooring and carpet, new fixtures, and new plumbing and electrical. They wanted a design and build company, so that one team would carry the whole project from start to finish.

The inside was opened up from floor to ceiling, and the foundation and framing for the addition went in. The earlier architect’s drawings did not show the new electrical layout for most of the house, so before the drywall went up Gordon walked the house with the crew to place each light, switch and outlet. Outside, the house was finished in new stucco.

Our crew photographed the house on one day in May 2025, during the finishing work: new stucco outside, new carpet in several rooms, white cabinets and a navy island in the kitchen, and the fireplace refaced in stacked stone beside a dark slatted feature wall. Gordon’s reveal video below shows the finished house.

In Gordon’s words

Gordon's Whole Home Renovation Reveal in Los AltosGordon’s Whole Home Renovation Reveal in Los Altos

“We wanted a design and build company because we wanted the whole project to be followed through by the same person.”

Gordon, why design and build

“When Ray came out to meet us, he walked the property. He actually gave some design input on the spot, which my wife was impressed with.”

Gordon, the first meeting

“These guys were here every day. I could count on them to be here working.”

Gordon, the crew

“With contractors, you don’t know what you’re going to get. With DevArt8, you know what you’re going to get.”

Gordon, looking back

The house in May 2025, during the finishing work

The brick chimney and the wing beside it in new stucco, with a ladder against the chimney
A wing of the house in new stucco with a single window, the ground along it still being finished
The kitchen during finishing: white upper cabinets, a navy island and lower cabinets, and a stainless refrigerator, the floor still covered
The fireplace refaced in stacked stone beside a dark slatted feature wall, with ladders and boxes still in the room
The living area with a wide sliding door to the yard, the stone fireplace and slatted wall at the far end, the floor covered for the finishing work
A room with green walls, a wood slat ceiling, a stacked stone wall and new carpet
A long room with a gray textured feature wall and new carpet, a paper runner laid down to protect it
A bathroom during finishing: a dark wood vanity with a white counter, a wood grain tile wall and the tub area still being tiled

Planning a whole home remodel in Los Altos?

Talk to the team that built this one. CSLB licensed (#1101484) and insured, building in the Bay Area for over 15 years.

Call (669) 322-3368