A 1952 house whose bathrooms had never been updated: patterned tile showers and wood vanities, a terrazzo-look entry hall with a mudroom, and wood stairs under a skylight, all photographed by our crew as it was built.

Christina and Jack’s house in San Francisco was built in 1952 and, in their words, barely renovated since. The bathrooms had never been updated and were small, and the stairwell they used to get down to the garage was not up to code. The plan they made with Ray enclosed part of the outside courtyard as an inside foyer and mudroom, so the old stairs could go, and updated the bathrooms.
One bathroom now has a walk-in shower in patterned black and white tile, a black hexagon tile floor, a skylight and a backlit mirror. Another has white vertical tile with mustard, green and navy accents around the tub and a terrazzo-look floor. Both have wood vanities and black fixtures. On the entry level, a long hall with a terrazzo-look floor runs from the front door past tall wood cabinets and a mudroom nook to the stairs, which now have wood treads, black metal handrails and a skylight overhead.
Our crew photographed the work every month from September 2025. September was demolition, with the bathrooms down to the studs. In October the courtyard was roofed over with a skylight framed in, and new walls went up. November was plumbing, wiring and insulation inside the new framing, and December was drywall and red waterproofing in the showers. January brought tile, fixtures and the hall floor, February the wood cabinets, and the finished rooms were photographed in March 2026.
Christina & Jack’s Full Home Remodeling Reveal in San Francisco
“We had a stairwell that we used to get up and down into the garage which was not up to code and very unsafe.”
Christina and Jack, the house before
“Every day at the end of the day, there’ll be multiple pictures sent as well as a video. And that was so comforting, knowing that if you couldn’t be here every day or if you couldn’t check in, that you were given an update in images, multiple, multiple images and video.”
Christina and Jack, the daily photo updates
“They’re so courteous. They’re so attentive. You feel like you can ask for anything, and they will do their best. Everything is taken care of so nicely. At the end of the day, things are straightened up and cleaned up. You’re never coming into a big mess.”
Christina and Jack, the crew








Demolition: the bathrooms stripped to the studs with the old tub still in place, and the walls of the ground floor hall opened up.



The courtyard roofed over with a skylight opening framed in, new walls framed, and a trench cut through the concrete floor of the hall.



Inside the new framing: drain lines, wiring and insulation, with building paper on the walls.



Drywall the length of the hall and in the bathrooms, and the showers coated in red waterproofing before the tile.



Tile and vanities in the bathrooms, the terrazzo-look floor down the hall, and the stairs kept under protective covers.



Tall wood cabinets and a mudroom nook built along the hall, and a wood barn door hung.