Project · San Francisco, CA

Christina and Jack’s San Francisco remodel, from September 2025 to March 2026

A 1952 house whose bathrooms had never been updated: patterned tile showers and wood vanities, a terrazzo-look entry hall with a mudroom, and wood stairs under a skylight, all photographed by our crew as it was built.

A finished bathroom in San Francisco: a walk-in shower with patterned black and white tile, a black hexagon tile floor, a wood vanity and a skylight
WhereSan Francisco, CA
WhatBathrooms, foyer, mudroom and stairs
WhenSeptember 2025 to March 2026
StatusCompleted

Christina and Jack’s house in San Francisco was built in 1952 and, in their words, barely renovated since. The bathrooms had never been updated and were small, and the stairwell they used to get down to the garage was not up to code. The plan they made with Ray enclosed part of the outside courtyard as an inside foyer and mudroom, so the old stairs could go, and updated the bathrooms.

One bathroom now has a walk-in shower in patterned black and white tile, a black hexagon tile floor, a skylight and a backlit mirror. Another has white vertical tile with mustard, green and navy accents around the tub and a terrazzo-look floor. Both have wood vanities and black fixtures. On the entry level, a long hall with a terrazzo-look floor runs from the front door past tall wood cabinets and a mudroom nook to the stairs, which now have wood treads, black metal handrails and a skylight overhead.

Our crew photographed the work every month from September 2025. September was demolition, with the bathrooms down to the studs. In October the courtyard was roofed over with a skylight framed in, and new walls went up. November was plumbing, wiring and insulation inside the new framing, and December was drywall and red waterproofing in the showers. January brought tile, fixtures and the hall floor, February the wood cabinets, and the finished rooms were photographed in March 2026.

Christina and Jack, in their own words

Christina & Jack's Full Home Remodeling Reveal in San FranciscoChristina & Jack’s Full Home Remodeling Reveal in San Francisco

“We had a stairwell that we used to get up and down into the garage which was not up to code and very unsafe.”

Christina and Jack, the house before

“Every day at the end of the day, there’ll be multiple pictures sent as well as a video. And that was so comforting, knowing that if you couldn’t be here every day or if you couldn’t check in, that you were given an update in images, multiple, multiple images and video.”

Christina and Jack, the daily photo updates

“They’re so courteous. They’re so attentive. You feel like you can ask for anything, and they will do their best. Everything is taken care of so nicely. At the end of the day, things are straightened up and cleaned up. You’re never coming into a big mess.”

Christina and Jack, the crew

The finished rooms

A backlit mirror and black wall sconces over a white counter with a black faucet, above white tile wainscot
The walk-in shower: patterned black and white tile on one wall, white tile with a niche on the other, and a black hexagon tile floor
A second bathroom with white vertical tile and mustard, green and navy accents around the tub, a wood vanity and a black framed mirror
A wood vanity with black pulls beside the toilet and the tub, on a terrazzo-look tile floor
Close up of the terrazzo-look floor tile, with the tub and the accent tile beyond
Tall wood cabinets along the hall, with the stairs and a black handrail at the far end
The stairwell under a skylight, with wood treads, a black metal handrail, a wood ledge and three glass pendants
Looking down the winding stairs: wood treads and black metal handrails on both walls

How it was built, month by month

September 2025

Demolition: the bathrooms stripped to the studs with the old tub still in place, and the walls of the ground floor hall opened up.

September: a bathroom stripped to the studs, with the old tub still in place
September: interior walls opened to the studs and the old pipes, with the doorways wrapped in plastic
September: the ground floor hall with one wall opened to the framing and the old stairs at the far end
October 2025

The courtyard roofed over with a skylight opening framed in, new walls framed, and a trench cut through the concrete floor of the hall.

October: new roof framing and a skylight opening over the former courtyard, between the stucco walls of the house
October: new wall framing going up, with tools and wiring in place
October: a trench cut through the concrete floor of the hall, with lumber stacked along the framing
November 2025

Inside the new framing: drain lines, wiring and insulation, with building paper on the walls.

November: new drain lines and insulation inside the framed bathroom walls
November: a new doorway framed, with building paper on the walls
November: the hall with new framing at the far end and plywood stacked against the wall
December 2025

Drywall the length of the hall and in the bathrooms, and the showers coated in red waterproofing before the tile.

December: drywall the length of the hall, with the stairs at the far end
December: a bathroom wall in drywall, with the plumbing stubbed out for the vanity
December: shower walls coated in red waterproofing, with a recessed niche, before the tile
January 2026

Tile and vanities in the bathrooms, the terrazzo-look floor down the hall, and the stairs kept under protective covers.

January: accent tile up around the new tub and the wood vanity set, with the floor still covered
January: the terrazzo-look tile floor laid down the hall, with the stairs covered for protection
Late January: the stairs under protective covers, with a wood platform built in beside them
February 2026

Tall wood cabinets and a mudroom nook built along the hall, and a wood barn door hung.

February: tall wood cabinets installed along the hall, seen from the front door
February: the mudroom cabinets, with tall doors, open shelves and a bench nook
February: a wood barn door hung on a black sliding rail

Planning a home remodel in San Francisco?

Talk to the team that built this one. CSLB licensed (#1101484) and insured, building in the Bay Area for over 15 years.

Call (669) 322-3368