A wall came out and the kitchen opened up to the high ceiling: green and wood shaker cabinets, a stone waterfall island, a dining wall of built-ins and a new light wood floor, all photographed by our crew as it was built.

Arjun and his wife bought this house in San Jose the year before. The old kitchen was small, with a large wall between it and the rest of the house. The first idea was to take out a small part of that wall. The plan grew into removing it and carrying the kitchen up to the high ceiling, which meant structural work, engineers and a city inspection.
The kitchen is now open to the living space: green shaker cabinets up to the ceiling, wood base cabinets with a strip of light underneath, veined stone counters carried up the walls, a waterfall island under two globe pendants, a cooktop under a white hood, stainless wall ovens and a skylight over the cooking wall. Across the room, a dining wall of green and wood built-ins has glass-front cabinets and open shelves set against the same stone.
Our crew photographed the work every month. December was structure and floors: the kitchen opened to the framing, the old floors pulled up and the new wide-plank floor going down. January was drywall, then the cabinets and counters. In February the ceiling was painted with the kitchen wrapped in plastic, and the kitchen was finished by the end of the month.
Arjun’s Open Concept Kitchen Transformation in San Jose
“This required a lot of structural work, a lot of back and forth with engineers and Ray pretty much coordinated everything smoothly to make sure our dream is coming true.”
Arjun, the structural work
“They have a really good WhatsApp group subdivided into design, construction, management, and so on and so forth. It’s very easy to communicate with people, get quick feedback, get really good opinions from them.”
Arjun, keeping in touch during the work
“They don’t overpromise, but at the same time, they promise and they deliver on stuff.”
Arjun, Ray and the crew








Structure and floors: the kitchen opened to the framing for the structural work, the old floors up, and by mid-December the new wide-plank floor going down at the entry.



Drywall over the opened ceiling in mid-January, then by the end of the month the green and wood cabinets, the stone counters and the sink under the window.