Project · San Jose, CA

Arjun’s open concept kitchen in San Jose, from December 2025 to February 2026

A wall came out and the kitchen opened up to the high ceiling: green and wood shaker cabinets, a stone waterfall island, a dining wall of built-ins and a new light wood floor, all photographed by our crew as it was built.

The finished San Jose kitchen: a stone waterfall island with two stools, globe pendants, green upper cabinets and a white range hood under a skylight
WhereSan Jose, CA
WhatKitchen, wall removal and floors
WhenDecember 2025 to February 2026
StatusCompleted

Arjun and his wife bought this house in San Jose the year before. The old kitchen was small, with a large wall between it and the rest of the house. The first idea was to take out a small part of that wall. The plan grew into removing it and carrying the kitchen up to the high ceiling, which meant structural work, engineers and a city inspection.

The kitchen is now open to the living space: green shaker cabinets up to the ceiling, wood base cabinets with a strip of light underneath, veined stone counters carried up the walls, a waterfall island under two globe pendants, a cooktop under a white hood, stainless wall ovens and a skylight over the cooking wall. Across the room, a dining wall of green and wood built-ins has glass-front cabinets and open shelves set against the same stone.

Our crew photographed the work every month. December was structure and floors: the kitchen opened to the framing, the old floors pulled up and the new wide-plank floor going down. January was drywall, then the cabinets and counters. In February the ceiling was painted with the kitchen wrapped in plastic, and the kitchen was finished by the end of the month.

Arjun, in his own words

Arjun's Open Concept Kitchen Transformation in San JoseArjun’s Open Concept Kitchen Transformation in San Jose

“This required a lot of structural work, a lot of back and forth with engineers and Ray pretty much coordinated everything smoothly to make sure our dream is coming true.”

Arjun, the structural work

“They have a really good WhatsApp group subdivided into design, construction, management, and so on and so forth. It’s very easy to communicate with people, get quick feedback, get really good opinions from them.”

Arjun, keeping in touch during the work

“They don’t overpromise, but at the same time, they promise and they deliver on stuff.”

Arjun, Ray and the crew

The finished kitchen

The cooktop wall: a white range hood, a veined stone backsplash, green upper cabinets and wood drawers lit from below
Two globe pendants over the stone island, with the cooktop, double wall ovens and a stainless refrigerator behind
The stone waterfall island beside tall green cabinets, stainless wall ovens and a French door refrigerator
The sink under a corner of windows, with wood base cabinets, green upper cabinets and a brass wall light
The U-shaped run of wood cabinets around the sink, with light strips under the base cabinets and under the green uppers
Looking past the refrigerator and the island toward the sink window and the skylight
The dining wall of green built-in cabinets with lit wood glass-front cabinets and open shelves, above a wood dining table
Close up of the built-in: wood shelves and glass-front cabinets against a veined stone backsplash, under a brass and black light fixture

How it was built, month by month

December 2025

Structure and floors: the kitchen opened to the framing for the structural work, the old floors up, and by mid-December the new wide-plank floor going down at the entry.

December: the kitchen wall and ceiling opened to the framing, with a miter saw on the plywood subfloor
December: the old floor pulled up to the plywood, with the furniture wrapped in plastic under the high ceiling
December: the new light wide-plank wood floor laid at the entry doors
January 2026

Drywall over the opened ceiling in mid-January, then by the end of the month the green and wood cabinets, the stone counters and the sink under the window.

Mid-January: taped drywall on the walls and the opened ceiling, with the floor under protection
Late January: green and wood cabinets installed and the stone counters set, before the range hood and appliances
Late January: the new sink and faucet set in the stone counter under the corner windows