A backyard ADU in San Jose, built from the foundation up, from May 2025 to February 2026

A detached ADU in a San Jose backyard, built from the foundation up: a vaulted kitchen and living room behind a wall of folding glass doors, two bathrooms, and our crew’s photos from every month of the build.

The main room of the finished ADU: a vaulted ceiling with a skylight, folding glass doors along one wall and the kitchen at the far end
WhereSan Jose, CA
WhatNew detached ADU
WhenMay 2025 to February 2026
StatusCompleted

This ADU stands on its own in the backyard, with white stucco walls under a gray shingle roof, black framed windows, a wall of black framed folding glass doors facing the yard and a pair of French doors. Inside, the main room has a vaulted ceiling with a skylight and an open kitchen: white shaker cabinets with brass pulls, a stainless range under a hood set against a wall of brown tile, a black sink under the window between floating wood shelves, a stainless refrigerator and a stacked washer and dryer.

There are two bathrooms. One has a glass shower with a wood look tile wall, a niche and a pebble tile floor, beside a light wood vanity. The other has speckled white tile, a green tiled niche and a dark wood vanity. The rest of the rooms have light wood look flooring and white doors, and one has a dark green accent wall.

Our crew photographed the work every month. May was the foundation: the site dug out and the forms set. In June the walls and roof were framed and sheathed. By the end of July the roof was shingled, the windows and doors were in and the first coat of stucco was on. August brought the ducts, the wiring and the drywall, and September the shower tile. The fixtures, floors and kitchen followed through the fall and winter, and the finished ADU was photographed in February 2026.

The finished ADU

The kitchen wall: white shaker cabinets, a stainless range and refrigerator, and a stacked washer and dryer under the skylight
The sink under the window between floating wood shelves, with a gray stone look backsplash and white cabinets with brass pulls
A wall of black framed folding glass doors looking out to the backyard
A bathroom with a glass shower, a wood look tile wall with a niche, a pebble tile floor and a black rain shower head
The second bathroom: a glass shower with speckled white tile and a green tiled niche, and a dark wood vanity beyond
A room with a dark green accent wall, light wood look flooring and a white door
A room with a pair of French doors opening to the yard
A room with a white sliding door closet and a doorway through to a bathroom
The finished ADU from the backyard: white stucco, a gray shingle roof, black framed windows, folding glass doors and French doors

How it was built, month by month

May 2025

The foundation: the site dug out, trenches cut and wood forms set along the footprint, with rebar on hand.

May: rebar stacked on the concrete beside the dug out site, with forms set in the background
May: foundation trenches dug and lined with wood forms
May, from above: the foundation forms and trenches laid out across the backyard
June 2025

Framing: the walls and roof framed on the new slab and sheathed, with openings left for the windows and doors.

June: the walls framed and sheathed, with the roof sheathing going on
June: the sheathed gable end of the new building
June, inside: the roof rafters and wall framing over the new slab, with an opening for the skylight
July 2025

The roof shingled, the windows, folding glass doors and French doors set, and by the end of the month the first coat of stucco on the walls.

Early July: the roof shingled and the windows, folding glass doors and French doors in, the sheathing still exposed
Late July: the first coat of stucco on the walls around the new windows and doors
Late July, inside: the folding glass doors and skylight in, the walls still open to the framing
August 2025

Ducts and wiring run through the ceiling framing, then drywall hung and finished in every room.

Mid August: ducts and wiring run through the ceiling framing around the skylight
Late August: drywall up and finished in a room with French doors
Late August: drywall finished around two closet openings
September 2025

Shower tile, a wood look wall with a niche over a pebble floor, while the floors in the other rooms were covered for protection.

September: a wood look tile wall with a niche and a pebble tile floor in the shower
September: the main room with its floor covered, the folding glass doors along one wall
September: a room with a window and a white door, the floor covered while work goes on