Matthew’s family was using the garage for storage and needed more room. It became a JADU with its own side entry, a main room and a laundry hall, built in about two months while the family lived at home.

From the street, the garage door is gone: in its place is a window framed in gray stacked stone, matching the stone on the rest of the house. A new door with glass panes opens into the JADU from the side of the house. Inside is a main room with light wood look flooring, recessed lights and a window, and a hall with a refrigerator, dark wood cabinets under a white counter, a front loading washer and a tankless water heater.
Our crew photographed the work in November and December 2025. In early November new floor framing was going in over the garage slab. By late November the subfloor was down, the walls were sheathed and drywall was going up, and outside, the garage door opening was framed around a window and wrapped for stone. In early December the walls were painted and trimmed, and the new side door and window were set into the side wall. The finished JADU was photographed on December 18.
Matthew says the whole job took about two months, with the family, a couple of babies and a dog living in the house the whole time.
Matthew’s Santa Clara ADU Reveal
“So we were just using the garage for storage and other things. So we decided to grow the house to provide more room for everybody.”
Matthew, why they built
“The process to get this done was pretty fast. It took about two months.”
Matthew, the timeline
“The workers that were contracted here were very polite. They asked us what times would be good to go in the house with a couple babies and a dog.”
Matthew, the crew
“There’s a lot of extra space that we can use to clean out the front end of the house.”
Matthew, the finished space






New floor framing over the garage slab, then the subfloor, wall sheathing and drywall, while outside the garage door opening was framed around a window and wrapped for stone.



The walls painted and trimmed, the floors covered, and a new door and window set into the side wall.



Talk to the team that built this one. CSLB licensed (#1101484) and insured, building in the Bay Area for over 15 years.