A single-car garage and an office built from scratch on a new foundation, with a wood-grain garage door, white stucco walls and a skylight, all photographed by our crew as it was built.

Keerthi and Monica had a carport and an old shed beside their house in Santa Clara, and in their words, no space to park a car. They asked for a garage and an office. The plan removed the shed and built the addition from scratch on a new foundation: a single-car garage and an office.
From the street, the garage has a wood-grain door with a column of narrow windows. Inside it is a finished room with painted walls, recessed lights and a concrete floor. From the backyard, the addition has white stucco walls and a covered entry beside the house. Inside, the rooms have wood-look plank floors, a skylight, a window with a shade and a wall-mounted mini-split unit.
Our crew photographed the work every month. In July the walls went up on the new slab. August was plywood, windows and the roof, and September was wire lath, the garage door and drywall, then the first coat of stucco. The finish coat and paint followed in October, and the finished addition was photographed in late October and November 2025.
Keerthi & Monica’s Santa Clara Home Remodel, Final Episode
“There was no space to park a car here. So there was only a carport. Now we can safely park the car. We can also get a lot of storage space in the garage. And we have an extra office room now.”
Keerthi and Monica, what the addition changed
“So we planned to go out of town so that they could finish. And I was surprised to come back to see like everything’s already set up. They promised one week that they’ll do framing and they finished.”
Keerthi and Monica, the framing week
“I noticed that on the WhatsApp groups, everybody was very communicative. So, like, if you were having a concern saying, hey, it’s too noisy, and they would immediately respond and stop.”
Keerthi and Monica, keeping in touch during the work








The new walls framed on a fresh concrete slab beside the house.



Plywood on the walls and the roof, the windows set, and a skylight opening framed into the roof.



Wire lath outside and the garage door hung, drywall inside, and by late September the first coat of stucco.