Parker and Josephine have three kids and a small house. Their garage became new rooms, a bathroom with a walk in shower, a kitchenette and a laundry, built in a little over three months and photographed every month.

From the street, the garage door is gone: in its place is a stucco wall over the original brick base, with a window in it. Inside, the old garage holds new rooms with mini split heating and cooling, a bathroom with a glass walk in shower and a wood vanity, a kitchenette with sage green cabinets, and a laundry with the water heater behind its own door. A new side entry with wood steps leads in from the yard.
Our crew photographed every stage. In January the garage was emptied and the walls opened. February was framing, insulation, new window openings and drywall, and the garage door opening was framed in and wrapped for stucco. March was finishes: taped drywall, the shower tiled, cabinets in and the side steps built. The JADU was finished in April.
Parker’s Garage Conversion JADU Reveal in Sunnyvale
“So we just needed some more space for our family. Our house is kind of small and we have three kids, so we needed some extra rooms and bathrooms.”
Parker and Josephine, why they built
“One of the big selling points I think for him was he wasn’t trying to oversell us anything.”
Parker and Josephine, choosing a builder
“So the work was done really fast and they were here every day.”
Parker and Josephine, the crew
“It’s nice to see it all come together. And it’s nice to come in here and just think about the things that we can do here now.”
Parker and Josephine, the finished space









The garage emptied and cleaned, then the walls opened and the slab prepared for the new floor.



Framing and floor framing, new window openings, then insulation and the first drywall.



Taped drywall, the shower tiled in green, cabinets in and new wood steps at the side entry.



Talk to the team that built this one. CSLB licensed (#1101484) and insured, building in the Bay Area for over 15 years.