Parker and Josephine’s garage, now a JADU: a Sunnyvale project, January to April 2026

Parker and Josephine have three kids and a small house. Their garage became new rooms, a bathroom with a walk in shower, a kitchenette and a laundry, built in a little over three months and photographed every month.

The converted garage from the driveway: a stucco wall with a window where the garage door was, over the original brick base
WhereSunnyvale, CA
WhatGarage conversion, JADU
WhenJanuary to April 2026
StatusCompleted

From the street, the garage door is gone: in its place is a stucco wall over the original brick base, with a window in it. Inside, the old garage holds new rooms with mini split heating and cooling, a bathroom with a glass walk in shower and a wood vanity, a kitchenette with sage green cabinets, and a laundry with the water heater behind its own door. A new side entry with wood steps leads in from the yard.

Our crew photographed every stage. In January the garage was emptied and the walls opened. February was framing, insulation, new window openings and drywall, and the garage door opening was framed in and wrapped for stucco. March was finishes: taped drywall, the shower tiled, cabinets in and the side steps built. The JADU was finished in April.

In Parker and Josephine’s words

Parker's Garage Conversion JADU Reveal in SunnyvaleParker’s Garage Conversion JADU Reveal in Sunnyvale

“So we just needed some more space for our family. Our house is kind of small and we have three kids, so we needed some extra rooms and bathrooms.”

Parker and Josephine, why they built

“One of the big selling points I think for him was he wasn’t trying to oversell us anything.”

Parker and Josephine, choosing a builder

“So the work was done really fast and they were here every day.”

Parker and Josephine, the crew

“It’s nice to see it all come together. And it’s nice to come in here and just think about the things that we can do here now.”

Parker and Josephine, the finished space

The finished JADU

The long main room of the JADU with wood look flooring, a mini split on the wall and the kitchenette at the far end
The kitchenette: sage green cabinets, a white counter with a sink and a black refrigerator
The bathroom with a glass walk in shower, green tile on the back wall and a wood vanity
Inside the walk in shower: green tile, a niche, a brass shower head and a linear drain
A new room with light blue walls, a window and a mini split heating and cooling unit
The hallway between the new rooms, with the bathroom door open on one side
The laundry and utility room with the water heater, a utility sink and space for the washer
New wood steps and a wood gate at the side entry of the JADU
The entry door into the JADU, a ceiling fan and windows on two walls

How it was built, month by month

January 2026

The garage emptied and cleaned, then the walls opened and the slab prepared for the new floor.

January: the two car garage emptied and the slab washed before work starts
Late January: the garage walls opened to the studs and the slab covered for the new floor
Late January: the floor prepared and marked out inside the opened garage
February 2026

Framing and floor framing, new window openings, then insulation and the first drywall.

February: new wall framing and floor framing inside the garage, under the existing roof
Late February: insulation in the walls around a new window, beside the water heater
Late February: the first drywall going up on the new walls
March 2026

Taped drywall, the shower tiled in green, cabinets in and new wood steps at the side entry.

March: the kitchenette cabinets installed, floor protected with paper
March: green tile going up on the shower wall, with a niche set in
March: the new wood steps built at the side entry