A garage converted into an ADU in West Hills, from September 2025 to February 2026

A garage turned into an ADU with an open kitchen and living room under a beamed ceiling, a bathroom with a backlit arched mirror, and a bedroom, photographed by our crew every month of the build.

The finished ADU: one open room under a sloped, beamed ceiling, with the kitchen and island on one side and the entry door on the other
WhereWest Hills, CA
WhatGarage conversion, ADU
WhenSeptember 2025 to February 2026
StatusCompleted

This ADU was a garage. From the driveway the garage door is gone: the opening was framed in, and the wall is smooth white stucco now, with a pair of high windows under the dark roof edge. Inside, one open room under a sloped ceiling with a wood beam and a skylight holds the living area and the kitchen: white flat panel upper cabinets, light wood lower cabinets, a stainless refrigerator, and an island with a white veined counter that wraps down its sides, a slatted wood front, a brass faucet and a woven pendant light above it.

The bathroom has a glass shower with a brass rain head, a ribbed wood look tile wall, a backlit arched mirror over a floating vanity, a wall hung toilet and a stacked washer and dryer. The bedroom has light wood look flooring and a window, and the main room and the bedroom each have a wall mounted mini split for heating and cooling.

Our crew photographed the work every month. In early September the garage was opened to the studs and its old floor broken up and dug out. By the end of the month there was a new slab, the new walls were framed and wired, and the garage door opening was framed in. October was drywall inside and wire lath for stucco outside. In November the floors, the kitchen cabinets and the shower tile went in, and December brought the appliances, the island counter and the bathroom fixtures. The finished ADU was photographed in February 2026.

The finished ADU

The living area looking toward the kitchen, with a skylight, recessed lights and a wall mounted mini split
The kitchen: white upper cabinets, light wood lower cabinets, a stainless refrigerator and an island with a white counter that wraps down its side
The island sink with a brass faucet under a woven pendant light, the living area beyond
The glass shower with a brass rain head, gray tile and a niche, beside a backlit arched mirror on a ribbed wood look tile wall
The bathroom: a white sink under a backlit arched mirror, arched shelves, a wall hung toilet and a stacked washer and dryer
The floating vanity, a white sink on a wood base with a brass faucet, and the wall hung toilet beside it
The bedroom with light wood look flooring, a bed and a white wardrobe
The finished ADU from the front yard: white stucco walls, black trim and a dark roof edge
The wall facing the driveway where the garage door used to be, now white stucco with a pair of high windows

How it was built, month by month

September 2025

The garage opened to the studs and its old floor dug out, then a new slab, new walls framed and wired, and the garage door opening framed in.

Early September: the garage opened to the studs and its old floor broken up and dug out
Late September: new walls framed on the new slab, with wiring run and a mini split mounted
Late September: the garage door opening framed in and sheathed, with a high window and the new entry door still in its wrap
October 2025

Drywall hung and taped inside, the entry door in, and wire lath on the outside walls ready for stucco.

October: wire lath on the framed in garage door wall, ready for stucco
October: drywall hung and taped in the main room, with a skylight and scaffolding
October: the entry door and a window in, the drywall taped around them
November 2025

Wood look flooring down, the kitchen cabinets and island base set, and wood look tile on the shower wall.

November: wood look flooring down in the main room, the mini split on the wall and the kitchen cabinets going in
November: the white upper cabinets and wood lower cabinets set, with the island base in front
November: ribbed wood look tile on the shower wall under a skylight, gray tile beside it
December 2025

The refrigerator and the island counter in, the bedroom ready, and by the end of the month the shower glass, brass fixtures and floating vanity.

December: the refrigerator in and the island topped with a white counter and a brass faucet
December: the bedroom with its floor down, a mini split on the wall and the door open to the hall
Late December: the shower glass, a brass rain head and the floating vanity installed in the bathroom