A detached ADU with walls of sliding glass, built from the foundation up, with a pool and an outdoor kitchen built in the same yard, photographed by our crew every month for over a year.

This ADU stands on its own across the yard from the main house: a flat roof with an overhang of exposed wood rafters, vertical brown siding, a stacked stone wall and walls of black framed sliding glass. Inside, one long room holds the living area and the kitchen under a wood beam, with light stone tile laid in a pattern on the floor. The kitchen has dark glass upper cabinets, taupe flat panel lower cabinets, a veined stone backsplash and counters, a range under a stainless hood with a pot filler, a wine refrigerator and an island with the stone wrapped down its sides.
The bathroom is walled in white marble look tile, with a rain shower head, a niche and a pebble tile shower floor, a wall hung toilet, and a vanity with a veined counter under a round mirror. In the same job a pool was built in the yard between the ADU and the main house, along with an outdoor kitchen: a stainless grill set in white stacked stone under a new pergola.
Our crew photographed the work every month. In May 2025 the site was dug out for the foundation, and in June a grid of rebar was laid, the slab poured and the first walls framed. By August the walls and the flat roof were framed and sheathed, and in September the glass walls went in and the building was wrapped. The pool was dug in October and its rebar and concrete shell went in during November. Inside, January brought insulation and drywall, February the floor tile, and March the shower tile, the cabinets and the siding and stone outside. The latest photos, from May and June 2026, show the kitchen counters in, the new lawn and the outdoor kitchen built, with the pool still to be filled.








The foundation forms set, a grid of rebar laid over the whole footprint, then the slab poured and the first walls framed on it.



The walls and the flat roof framed and sheathed in plywood, with the rafters of the overhang left exposed.



Rebar tied through the dug out pool, then its concrete shell formed with steps and benches, the wrapped ADU behind it.



The glass walls in and the walls wired, insulation delivered, and drywall up by the end of the month.



Stacked stone and wood siding outside, marble look tile in the shower and the bathroom cabinets set.