Project · Woodside, CA

A new ADU and a pool in one Woodside yard, from May 2025 to June 2026

A detached ADU with walls of sliding glass, built from the foundation up, with a pool and an outdoor kitchen built in the same yard, photographed by our crew every month for over a year.

The ADU across the new lawn and the pool, its black framed glass walls under a flat roof
WhereWoodside, CA
WhatNew detached ADU and pool
WhenMay 2025 to June 2026
StatusFinal stage, June 2026

This ADU stands on its own across the yard from the main house: a flat roof with an overhang of exposed wood rafters, vertical brown siding, a stacked stone wall and walls of black framed sliding glass. Inside, one long room holds the living area and the kitchen under a wood beam, with light stone tile laid in a pattern on the floor. The kitchen has dark glass upper cabinets, taupe flat panel lower cabinets, a veined stone backsplash and counters, a range under a stainless hood with a pot filler, a wine refrigerator and an island with the stone wrapped down its sides.

The bathroom is walled in white marble look tile, with a rain shower head, a niche and a pebble tile shower floor, a wall hung toilet, and a vanity with a veined counter under a round mirror. In the same job a pool was built in the yard between the ADU and the main house, along with an outdoor kitchen: a stainless grill set in white stacked stone under a new pergola.

Our crew photographed the work every month. In May 2025 the site was dug out for the foundation, and in June a grid of rebar was laid, the slab poured and the first walls framed. By August the walls and the flat roof were framed and sheathed, and in September the glass walls went in and the building was wrapped. The pool was dug in October and its rebar and concrete shell went in during November. Inside, January brought insulation and drywall, February the floor tile, and March the shower tile, the cabinets and the siding and stone outside. The latest photos, from May and June 2026, show the kitchen counters in, the new lawn and the outdoor kitchen built, with the pool still to be filled.

The ADU and the yard

The main room: light stone tile laid in a pattern, sliding glass along one side and the kitchen and island at the far end
The kitchen wall: dark glass upper cabinets, a range under a stainless hood, a pot filler, a veined stone backsplash and a wine refrigerator
The bathroom: white marble look tile, a rain shower head, a pebble tile niche and shower floor, and a wall hung toilet
The ADU from the patio: vertical brown siding, a stacked stone wall, black framed glass doors and an overhang of wood rafters
The outdoor kitchen: a stainless grill and side burner over stainless doors and drawers, set in white stacked stone
The corner of the outdoor kitchen: white stacked stone counters with stainless doors and drawers, on stone paving
The pool before it was filled, with built in steps, and the ADU behind it across the yard
Stone paving laid under the new pergola, the outdoor kitchen base on one side and a stone faced wall on the other

How it was built, month by month

June 2025

The foundation forms set, a grid of rebar laid over the whole footprint, then the slab poured and the first walls framed on it.

June 2025: the site graded and the foundation forms set out across the yard
June 2025: a grid of rebar laid over the whole footprint, ready for the slab
Late June 2025: the first walls framed on the new slab
August 2025

The walls and the flat roof framed and sheathed in plywood, with the rafters of the overhang left exposed.

August 2025: the ADU framed and sheathed in plywood, with the roof overhang along the front
August 2025: the flat roof decked in plywood, with low walls around its edge
Late August 2025: the sheathed walls under the exposed rafters of the overhang, scaffolding inside
November 2025

Rebar tied through the dug out pool, then its concrete shell formed with steps and benches, the wrapped ADU behind it.

Early November 2025: rebar tied through the dug out pool, the main house beyond
Late November 2025: the pool's concrete shell formed, with the wrapped ADU at the far end
Late November 2025: concrete steps and benches formed inside the pool shell
January 2026

The glass walls in and the walls wired, insulation delivered, and drywall up by the end of the month.

January 2026: the glass walls in and the open walls wired inside the ADU
January 2026: insulation delivered and stacked inside the framed walls
Late January 2026: drywall up in the main room, with the kitchen wall roughed in
March 2026

Stacked stone and wood siding outside, marble look tile in the shower and the bathroom cabinets set.

March 2026: a stacked stone wall and wood siding going on outside, under the rafter overhang
March 2026: white marble look tile, a rain shower head and a pebble tile floor in the shower
March 2026: the bathroom cabinets set, still in their protective labels

Planning an ADU in Woodside?

Talk to the team that built this one. CSLB licensed (#1101484) and insured, building in the Bay Area for over 15 years.

Call (669) 322-3368